"Bridge along with road was sanctioned in 2019...": Jharkhand Construction Department's Executive Engineer on Bridge collapse
Jun 30, 2024
"This bridge along with the road was sanctioned in 2019. The other aspects will be revealed only after investigation," Executive Engineer of the State...