Mumbai-Ahmedabad Bullet Train Project: Second TBM Cutterhead installed at Ghansoli shaft
May 23, 2026
In a major milestone for the Mumbai-Ahmedabad High-Speed Rail Corridor, the cutterhead of the second Tunnel Boring Machine (TBM) was lowered at Sawli (Ghansoli)...