Sat, Jun 07, 2025 | Updated 05:41 IST
Himachal: Larji Power Project restored and fully operational once again
May 18, 2025
The 126 MW Larji Hydroelectric Power Project in Kullu district has been fully restored and is operational once again, which suffered extensive damage from...
India-assisted Mangdechhu Hydroelectric Project handed over to Bhutan's Druk Green Power Corp
Dec 28, 2022
The handing over of the 720 MW Mangdechhu Hydroelectric Power Project by Mangdechhu Hydroelectric Power Project Authority (MHPA) to Druk Green Power Corporation (DGPC)...
J-K Chief Secretary visits Kishtwar; inspects Rattle, Dul Hasti Hydroelectric Power projects
May 16, 2025
Jammu and Kashmir Chief Secretary Atal Dulloo on Friday visited Kishtwar district and inspected the ongoing works and operational status of two major hydroelectric...
Gates of Baglihar Power Project Dam in J-K closed
May 13, 2025
All gates of the Baglihar Hydroelectric power project Dam built on the Chenab river in Ramban have been closed
J&K: Two gates of Baglihar Dam opened after heavy rainfall
May 08, 2025
The two gates of the Baglihar Hydroelectric Power Project Dam built on the Chenab River in Ramban have been opened.
Gates of Baglihar Hydroelectric Power Project Dam remain closed
May 14, 2025
All the gates of the Baglihar Hydroelectric Power Project Dam, which is built on the Chenab river in Ramban, have been closed for the...
IREDA to invest Rs 290 cr in Nepal 900 MW hydro projects
Jul 17, 2024
Union Power Minister reviews construction progress of Subansiri Lower Hydroelectric project
May 31, 2023
Complete Shongtong Hydroelectric Power Project by 2025: CM Sukhu directs officials
Mar 11, 2023
Nepal to handover contract for construction of 750 MW West Seti Hydel to NHPC India
Jun 07, 2022
CBI searches over 30 locations for alleged irregularities in Kiru Hydroelectric Power Project
Feb 22, 2024
L&T sells Singoli-Bhatwari hydroelectric project to Renew Power for Rs 985 cr
Aug 11, 2021
Related Videos
No Result Found