Breakthrough achieved in 6.59-km tunnel of Rishikesh-Karnaprayag Rail Project
Nov 27, 2026
Indian Railways has achieved a breakthrough in the 6.59-km-long Tunnel-14 of the Rishikesh-Karnaprayag Rail Project in Rudraprayag district, connecting the two excavated sections of...