2.7 km long continuous tunnel completed with first breakthrough in 21 km tunnel between BKC and Shilphata
Jul 11, 2025
Out of the total 21 km tunnel, 5 km is being constructed using the New Austrian Tunnelling Method (NATM) between Shilphata and Ghansoli, while...