Mumbai-Ahmedabad Bullet Train project: Bridge on Vishwamitri River in Vadodara completed
Aug 06, 2025
Spanning 80 meters, this bridge is located adjacent to the Vadodara-Surat main line of Western Railways. The bridge comprises three piers, one of which is positioned in the river stream and the other two on the banks of the river (one on each side).